The Load Management 2026 Winter Preparedness Event for Interruptible Heat (Dual Fuel) accounts is scheduled for Wednesday, November 18th, 2026. This load control test is performed in advance of the winter Full Load Control season to ensure member familiarity with the control sequence and to ensure that backup heating systems have been validated for proper function. An approximate timeline for the event will be:
|
Date and Time |
Event Status |
|
Preceding evening (17-November) |
Event notifications issued ★ |
|
11/18/2026 ≈ 06:55 |
Event start time - Loads will begin to be interrupted |
|
11/18/2026 ≈ 07:00 |
All loads will be interrupted (2,2W,4B) |
|
11/18/2026 ≈ 10:00 |
Class 2, 2W, and 4B will begin diversified restoral |
|
11/18/2026 ≈ 10:30 |
Class 4B loads will be fully restored |
|
11/18/2026 ≈ 11:00 |
Class 2 and 2W loads will be fully restored |